• Home
  • Domestic Systems
  • Studios/Workshops
  • Commercial Systems
  • Contact
  • About Us
  • Home
  • Domestic Systems
  • Studios/Workshops
  • Commercial Systems
  • Contact
  • About Us

Bundure Rest Area

Client: NSW Roads and Maritime Services
​This installation copes with periodic heavy loads at a remote vandal prone site beside the Sturt Highway on the Hay plains. One of a number we have installed for RMS.

It has two disabled cubicles serviced by a model CM40 Clivus Multrum unit with a capacity of 40,000 uses per year - or approx. 110 uses per day. A solar panel mounted on a mast powers the exhaust fan and a small bilge pump which lifts the excess fluids from a sump to a small absorption trench - a requirement dictated by the flat terrain. A rainwater tank mounted on the building supplies a handbasin.
>>>>
More information